Bihar is among the sunniest states in India and, with 2026 coming around the corner it’s also among the most exciting areas to get solar. The central government’s PM Surya Ghar: Muft Bijli Yojana providing subsidies of up to ₹ 78,000 and a maximum of ₹ 78,000, there’s never been a better time to encourage Bihar homeowners to set up solar panels on their roofs and cut their power bills forever. However, despite receiving over 54,000 requests, Bihar continues to have one of the lowest rooftop solar installation rates in India relative to its population. As a result, many families miss the opportunity to benefit from government subsidies and significantly reduce their monthly electricity costs. Furthermore, this slow adoption limits access to long-term savings and clean energy solutions.
This comprehensive guide from Usha Solar will walk you through all you need to know regarding the subsidy for solar panels offered in Bihar. It covers what you can save, who’s eligible for the subsidy, how to apply step-by-step and the reasons why selecting the best solar provider is important.
Why Bihar Is Perfect for Solar Energy
Before we get into subsidy programs first, let’s look at the reasons why solar power is an investment that is highly beneficial to Bihar residents:
Unstoppable Sunlight Year-Round Bihar is blessed with five to 5.5 maximum sun hours each day, which gives it an exceptional sun energy capacity. Rooftop solar panels produce huge output, not only in summer, but throughout the year, ensuring stable power, even when load-shedding is in effect.
Increased Electricity Costs Electricity tariffs in Bihar under SBPDCL and NBPDCL have been steadily increasing in the past five years. A solar panel locks your energy costs at a near-zero level for the next 25 years or more and protects your home from any future price hikes.

Load Shedding Relief In semi-urban and rural Bihar power interruptions continue to be a constant problem. A solar-powered system and batteries backup – will give you power for as long as the grid is down.
Net Metering benefits Bihar’s Net Metering policy, which is managed through BSPHCL (Bihar State Power Holding Co. Limited) through SBPDCL and NBPDCL which allows you to sell surplus solar energy back to the grid. Extra units are credited to your electricity bill which makes your investment more efficient.
What Is the Solar Panel Subsidy in Bihar?
The solar subsidies that are available to Bihar residents is provided from the government’s Surya Ghar: Muft Bijli Yojana which is a major central government program that was launched in February 2024, with an outlay of ₹75,021 crore, which covers more than one crore households in India.
PM Surya Ghar: Muft Bijli Yojana Subsidy Slabs (2025-2026)
| System Capacity | Subsidy Amount | Monthly Free Electricity |
| Up to 1 kW | ₹ 30,000 | 100 units or more |
| 2 kW | ₹ 60,000 | As high as 200 units |
| 3 kW | ₹ 78,000 | As high as 300 units |
| Over 3 5 kW (up to 10 up to 10) | ₹78,000 (capped) | Varies |
Subsidy is calculated as follows:
* ₹30,000 per kW for the first 2 kW
* ₹18,000 for the additional 1 kW
* Maximum subsidy capped at ₹78,000
The subsidy is credited directly into your bank account (DBT) within 30 to 45 days of the system’s being approved and commissioned by your local DISCOM No middlemen, and no delays.
As of March 2026, the scheme had already benefited more than 32 lakh households across India and distributed over ₹14,771 crore in subsidies. Furthermore, Bihar has disbursed ₹102.27 crore in subsidies so far. In addition, the state is actively expanding its solar infrastructure, with a 275 MW tender launched through SBPDCL and NBPDCL. Consequently, Bihar is making significant progress toward wider rooftop solar adoption and clean energy development.
How Much Does a Solar System Actually Cost in Bihar After Subsidy?
Here’s the actual cost breakdown of the cost for Bihar homeowners:
2 kW Solar System (Ideal for a 2-3 BHK Home)
| Cost Component | Amount |
| Cost of the system before subsidy | ₹1,20,000 – Rs1,40,000 |
| PM Surya Ghar: Muft Bijli Yojana Subsidy | ₹60,000 |
| Cost net to you | ₹60,000 – Rs80,000 |
| Savings on electricity every month | ₹1,200 – ₹2,000 per month |
| Period of payback | Between 4-6 years |
3 kW Solar System (Ideal for Large Residential Homes), Since PM Surya Ghar subsidy is for residential consumers only.
| Cost Component | Amount |
| Cost of the system before subsidy | ₹1,60,000 – Rs1,90,000 |
| PM Surya Ghar: Muft Bijli Yojana Subsidy | ₹78,000 |
| Cost net to you | ₹82,000 – Rs1,12,000 |
| Savings on electricity every month | ₹2,000 – ₹3,500 per month (depending on consumption and tariff) |
| The time to pay back | 4 to 5 years old |
After paying back, you can enjoy 20+ years of almost-zero electric bills, plus potential earnings from net-metering credits.
Who Is Eligible for Solar Subsidy in Bihar?
The PM Surya Ghar: Muft Bijli Yojana is a program with easy eligibility conditions:
- Indian citizen residing in Bihar
- Homeowner who owns a residential property (owned home or apartment)
- Active electricity connection as per SBPDCL or NBPDCL
- Bank account with valid linkage to Aadhaar to allow DBT subsidy transfer
- Rooftop space sufficient to allow Panel installation (approx. 10 sq. meters per kW)
- Group Housing Societies (GHS) and Residential Welfare Associations (RWAs) are also able to apply for common-area solar installations.
Who is not qualified:
- Industrial or commercial customers (the scheme is only residential)
- Consumers who’ve been granted solar subsidies under an earlier MNRE program for the identical property
Step-by-Step: How to Apply for Solar Subsidy in Bihar
Step 1 – Register on the National Portal
First, visit pmsuryaghar.gov.in and register an account using your mobile number and Aadhaar details. Next, Bihar consumers should use the SBPDCL or NBPDCL consumer number from their latest electricity bill to complete the registration process.
Step 2 – Apply via the SUVIDHA App (Recommended)
Bihar State Power Holding Company Limited has made the process easier by introducing the SUVIDHA mobile application. The application can be downloaded from the Play Store, logged in with the consumer number, digitally signed, and submitted directly from a smartphone without visiting an office.
Step 3 – Wait for Feasibility Approval
Your DISCOM local (SBPDCL or NBPDCL) will review the application and give you the feasibility approval within a couple of working days. Do not start installation prior to receiving this approval – this will disqualify you from receiving the subsidy.
Step 4 – Choose an Empanelled Solar Vendor
Only projects completed by MNRE-approved or DISCOM-approved suppliers can be eligible for the subsidy. Usha Solar is your reliable supplier of quality, reliable solar installations throughout Bihar.
Step 5 – Installation and Net Meter Application
After your solar system is then installed. The vendor then will submit the net meter application to the SBPDCL/NBPDCL. The bidirectional meter is used to monitor both the power used from the grid and excess power exported to it.
Step 6 – DISCOM Inspection and Commissioning
When the installation is completed After installation is completed, your DISCOM checks the system. After a successful testing and distribution, you will receive an official commissioning certificate.
Step 7 – Receive Subsidy in Your Bank Account
Enter your bank’s details through the portal, along your commissioning certification. You can receive up to ₹78,000 in subsidy through Direct Benefit Transfer (DBT) within 30 to 45 days.

Additional Financing: Low-Interest Solar Loans for Bihar Residents
If the initial cost after subsidy is still an over-spent amount the government has set up low-interest, no-collateral loans from banks of the public sector specifically for the PM Surya Ghar: Muft Bijli Yojana beneficiaries.
- SBI Surya Ghar Loan -Competitive rates of interest, repayment term as long as 10 years
- Bank of Baroda, PNB, Canara Bank — provide solar loans with dedicated products
- EMIs can be less than your monthly electric bill, which makes solar self-financing investments beginning from the first day.
Usha Solar’s team helps clients in navigating the loan application process and solar installations to make the process simple and easy.
The Bihar Net Metering Program: Make Money from Your Rooftop
In Bihar’s net metering policies, the solar system you have installed connects to grid using the bidirectional meters. Any extra electricity that the panels produce that exceeds the needs of your home’s power is transferred into the grid.
How does it work:
- Your bidirectional meter records both imported (consumed) and exported (surplus) electricity units.
- You pay only for your net energy usage after adjusting exported units against imported units.
- The system carries forward any unused credits to the next billing cycle.
- The period for settlement is monthly.
This means that a 3 KW system that generates the equivalent of 400 units a month, versus the consumption of a typical household of 250 units gives you 150 units of credit, basically a negative electric bill during Bihar’s hottest months.
Bihar’s Solar Expansion in 2026: A Growing Opportunity
Bihar’s rooftop solar program is growing rapidly by 2026:
- SBPDCL along with NBPDCL have launched an invitation to tender for 275 MW in rooftop solar power capacity over all 18 distribution circles within the state in the PM Surya Ghar: Muft Bijli Yojana utility-led Aggregation (ULA) model.
- Bihar Renewable Energy Development Agency (BREDA) is actively helping to promote solar adoption through awareness programs and local assistance
- The scheme offered by the central government will be in effect until 2026-27. This gives Bihar residents ample time to take action and get the maximum benefits before the current phase is over.
Why Choose Usha Solar for Your Bihar Solar Installation?
The process of navigating subsidies, DISCOMs, and technical specifications can be a bit overwhelming. Usha Solar is there to help you through every step, so you do not have to.
MNRE Certified & DISCOM Empanelled
Our systems are eligible for the Prime Minister Surya Ghar subsidy. Each system we install is in compliance with the quality and technical requirements of the government. requirements. This means there are no surprises in the DISCOM inspection.
A-Grade Mono PERC Solar Panels
We only use PID-free Grade A PERC solar cells made under European high-quality processes. Our panels come with the warranty of 25 years performance at least 90% output after 10 years, and 80.2 percent in the following 25 years.
End-to-End Subsidy Assistance
Starting with the registration process on the portal for the PM Surya Ghar: Muft Bijli Yojana portal to submission of applications for net meters and follow-up on subsidy disbursements – Usha Solar manages the entire procedure and paperwork on behalf of you.
Pan-Bihar Installation Network
We’re able to execute projects across Bihar including Patna, Gaya, and Muzaffarpur to Bhagalpur, Darbhanga, and beyond. If you’re living in a city home or in a rural area our teams are there to assist you.
Transparent Pricing, No Hidden Costs
The price you’re given is the amount you will pay. There are no surprises after installation. No overinflated costs. A complete breakdown of costs -panel, inverter construction, installation and subsidy deduction all clearly laid out upfront.
Low-Interest Loan Tie-Ups
We partner with leading banks to provide affordable solar loans, making it easier to switch to solar without financial concerns.
FAQ’s:
Q1: What solar subsidy will I be able to get for Bihar from 2026?
A: In the PM Surya Ghar: Muft Bijli Yojana homeowners in Bihar are eligible to receive as much as 2 kW System₹78,000 for a 3-kW or more. For smaller systems, the cost is ₹30,000 for 1 kW, and ₹60,000 for a 2 kW system.
Q2: Do you know if the subsidy is available for commercial establishments located in Bihar?
A: No. This PM Surya Ghar: Muft Bijli Yojana subsidies are only available to residential customers. Industrial and commercial consumers are not eligible.
Q3: What time will it take to be eligible for the subvention in Bihar?
A: After successful installation, DISCOM inspection, and commissioning, you usually receive the subsidy in your bank account within 30 to 45 days.
Q4: What is the best way to apply for solar subsidies in Bihar even if my electric connection is in NBPDCL?
A: Yes. Both SBPDCL (South Bihar) and NBPDCL (North Bihar) customers are eligible to apply. You’ll need your consumer number, which is on your last electricity bill.
Q5: What kind of solar system should I put in a typical house in Bihar?
A: The ideal system size depends primarily on monthly electricity consumption, available rooftop space, and future energy requirements. The larger homes that use 400-600 units per month require a 3-5 kW system. Usha Solar’s team will evaluate your expenses and suggest the best size, for you at no cost.
Q6: Can I avail a solar loan with subsidies in Bihar?
A: Yes. A lot of banks in the public sector offer solar loans that are not collateral-free for people who are PM Surya Ghar: Muft Bijli Yojana beneficiaries. The amount of subsidy is recalculated in relation to the loan and EMIs can be lower than your electricity bill.
Q7: Do you know if Usha Solar handles the subsidy documentation in Bihar?
A: Absolutely. Usha Solar manages the entire procedure starting with portal registration and DISCOM approvals, through the commissioning of the system and follow-up on subsidy.